Design & Fit Out
In addition to cleaning, our approach includes efficient equipment servicing. Our design team integrates lean processing and flow creation systems to optimize space and enhance efficiency. Through strategic segregation, we ensure that cross-contamination is effectively prevented.
Design Process
Stage 1 Initial Design
Conceptual design for cleaning and maintenance room is drawn up after discussion, taking into account the clients space, type of facility required, contamination type and budget.
Stage 2 Development of Design
Following a presentation to the client any changes are accommodated, defining changes to cleaning and disinfection methodology is key, as layout will be affected.
Stage 3 Realisation
Once the project has been authorised to proceed, a schedule for installation, materials procurement and installation can begin to agreed timeframes. Once complete, equipment is commissioned and training handover provided to the client.
Stage 4 Maintenance & Support
Once installed, most equipment is relatively low maintenance, but ongoing servicing, repair and support is provided to ensure operability through its life cycle.